| This renovation consists of converting an existing 5,100 s.f. primary/secondary duplex into a 6,700 s.f. duplex home. The existing T&G siding will be replaced with rough sawn cedar shiplap siding, stone-veneered entries, and stucco. The existing cedar shake cold roof will be converted to a cedar shake super- insulated roof. The existing decks will be removed and replaced with rough sawn cedar decks with timber and wrought iron guardrails. These images are of the existing east unit exterior. |
![]() |
![]() |
| These images are of the west unit's existing interior. The living room and hearth room in the top images will have dormers installed above to allow for transom windows to bring in more natural light. The kitchen in the lower right image will be removed and renovated. The crawl space in both east and west units will be underpinned and reclaimed to create additional living space, such as additional bedrooms, media rooms, and a wine room in the west unit. |
![]() |
![]() |
![]() |
![]() |
![]() |
| These images show the
exterior reconstruction. A new cedar shake roof, additional
dormers and windows for more natural light, new exterior finishes, and
landscaping has been added. |
![]() |
|
![]() |
| This image below shows the kitchen of the West
unit. The large windows at the great room, seen in the
background, are new and offer a wonderful view
of the hills to the North. |
This
image below shows the kitchen of the East unit. All finishes are
new and the great room floor level has been raised to the kitchen level
giving both spaces a larger feel. |
![]() |
![]() |
![]() |
![]() |
| This wine room has been added to
the west unit. |
The master bedroom renovation has given it
custom cabinetry and a large gas fireplace. |